BLOG
![](https://minniedaleprojects.com/wp-content/uploads/2023/08/P111-17B-Proposed-Perspective-Views-b-1024x527.jpg)
Epsom Downs detached house
We were appointed to lead all the pre-construction stages on behalf of our self-build client for their 440m2 detached house overlooking the Epsom Downs and
![](https://minniedaleprojects.com/wp-content/uploads/2021/02/Picture2-3.png)
Christian Youth Enterprises
Chichester We are currently working for ‘Christian Youth Enterprises’ in Chichester to lead all the pre- construction work, tender phase, Contract Administration and Building Consultancy
![](https://minniedaleprojects.com/wp-content/uploads/2023/07/Picture5.png)
New Build Flats in Reigate, Surrey
We were instructed by the developer to write a detailed Schedule of Works tender document for new build flats in Reigate, Surrey. The scheme involved
![](https://minniedaleprojects.com/wp-content/uploads/2023/04/GOmr-N3I-scaled-1-1024x665.jpeg)
Copperfields / Beaconsfield – Professional Pictures
A blend of modern and traditional styling this single storey rear extension was built using salvaged bricks to match the original house. The aim of
![](https://minniedaleprojects.com/wp-content/uploads/2023/04/Thornhurst-1-300x156-1.png)
SCHEDULE OF WORKS – competitive TENDER
Minniedale Projects have been appointed to write a detailed Schedule of Work pricing document for a client in West Sussex for the tender of their
![](https://minniedaleprojects.com/wp-content/uploads/2023/04/Photo-03-02-2021-13-45-35-scaled-1-768x1024.jpg)
SOIL SAMPLES – WHY ARE THEY IMPORTANT FOR YOUR NEW BUILD PROJECT?
We recently arranged ground investigations/soil samples to be collected for our 450sqm new build boat house facility near Chichester which is due to break ground
![](https://minniedaleprojects.com/wp-content/uploads/2023/04/Photo-29-10-2020-10-43-42-scaled-1-1024x768.jpg)
MONITORING & COST CONTROL SITE VISITS
If you don’t need a full-time project manager on your build we offer a monitoring service. The service consists of staged visits to site to
![](https://minniedaleprojects.com/wp-content/uploads/2023/04/ESHER.png)
TWO STOREY SIDE EXTENSION | ESHER
We were recommended by a builder to a couple in Esher who had received planning permission for a two storey side extension and external renovation
![](https://minniedaleprojects.com/wp-content/uploads/2023/04/IMG_8931-1024x768.jpeg)
CHANGE OF USE | OLD NATWEST BANK BILLINGSHURST
We recently worked with Meadows Wellbeing in Billingshurst, West Sussex. They purchased an old Natwest bank on the high street and approached us to produce
![](https://minniedaleprojects.com/wp-content/uploads/2023/04/5.jpg)
NEW HOME SNAGGING SURVEY
Minniedale Projects were instructed to carry out a full snagging survey on a new build house in Arundel, West Sussex ahead of our clients moving
![](https://minniedaleprojects.com/wp-content/uploads/2023/04/unnamed-95.jpg)
ROOF | EXTENSION
We were approached by Ben Reed Architects (benreedarchitects.com) to write a detailed Schedule of Work pricing document for competitive tendering of this contemporary ‘bronze effect’
![](https://minniedaleprojects.com/wp-content/uploads/2023/08/unnamed-2020-12-23T212848.171.jpg)
NEW BUILD
We’re assisting our self-build client in West Sussex with arranging new utility connections for two new 4 bedroom detached houses. Minniedale Projects are coordinating the